Curriculum Response Interval instrument
KER7 · WP2 → WP4Curriculum Response Interval instrument and site-dyad protocol
The measurement Europe does not currently make: how long a training system takes to answer a change of process at the workplace it serves, and who is admitted to the answer. Owned by CNAM, published as a protocol in the field manual any region can re-run – which is what makes RQ5 an exploitable result and not only a research question. The site-dyad protocol comes first, in WP2 (D2.3, M9); the interval is measured at the 12 Round 1 dyads in WP4 (D4.5, M24), re-measured there in Round 2 (D7.1, M38) and consolidated in the taught layer in WP8 (D8.5, M42).
